Description
Technical Description
Mold Building Lead Time | T1, 15 to 25 Working days, Part measurement report (upon required). |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. Or as per Customer’s Requirement. |
Surface Finish | Texture (MT standard), High gloss polishing |
Cavity or Core Steel | P20, 2311, H13, 2344, Starvax 420, 236, AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 …etc. |
Hotor Cold Runner | HUSKY, INCOE, YDDO, HASCO, DME, MoldMaster, Masterflow, Mastip, Taiwan made brand…etc. |
Mould Life | 5,000 shots to 1,000,000 Shots. (According to your working environment.) |
Design & Program Softwares |
CAD, CAM, CAE, Pro-E, UG, Soild works, Moldflow, CATIA, etc. |
Equipments | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder, Plastic Injection Molding Machine for trial out mold from 50-3000T available. |